A paver walkway that lasts needs three things most people skimp on. It needs a compacted gravel base of at least 6 to 8 inches, an edge restraint spiked into that base, and a finished edge that sits flush with the lawn so the mower can ride right over it. Get those right and the pattern you pick is the fun part. Get them wrong and you’ll be pulling up sunken pavers in two springs.
Every hard edge that meets the lawn is something you either mow along or trim along. So ask two things of any walkway: does it hold up, and does it make mowing easier or harder? A walk can do both if you build it right, and some designs play nicer with a mower deck than others.
How Wide to Make the Walk

Start with width, because it sets everything else, from how much you dig to how many pavers you buy. Here’s a handy ladder of walkway widths. An 18-inch path is the bare minimum, 24 inches is functional, and 30 inches fits one person. Thirty-six inches is the standard, and 48 inches lets two people walk side by side. A path that gets a lot of use, like the one to your front door, should be at least 4 feet wide.
For a side-yard path to the shed or the garden, 36 inches is what I’d build. Stuck between two widths? I’d go with the wider one, since an overly wide path beats an overly narrow one. If you’ll ever roll a mower or a cart across it, think about where the wheels will go before you set the first stone.
Base Depth: The Part Nobody Sees

Honestly, every paver walk that fails, fails underneath.
So start there. Under a walkway, plan on 6 to 8 inches of compacted gravel at the very least, the same as under a patio. A driveway needs 10 to 14 inches. On top of the gravel goes 3/4 to 1 inch of coarse concrete sand for bedding.
That means digging, so before you start, have the utility, phone and cable companies mark any buried lines. I wouldn’t skip that call. Then dig at least 6 to 12 inches deep, depending on what you’re building, and deeper if the soil’s been disturbed before. For a flush walk on 6 to 8 inches of gravel, that works out to about 9 to 11 inches, since the sand and pavers take up the top 3. Take out all the loose soil. Make the hole at least 3 inches wider on each side than the walk itself, so the base runs out past the pavers and under the edging.
For the base itself, use 3/4-inch crusher run (a gravel and sand mix). To figure how much to order, run the walk’s length, width and base depth through a gravel calculator and it’ll give you cubic yards and tons.
Compaction and Slope: Do It in Lifts

You can’t dump 8 inches of gravel and pack it from the top. Put it down in layers 2 to 3 inches thick and pack each one with a plate compactor before the next goes on. Keep going until you reach the height you need and the base is solid.
Build in slope while you go. Pitch it away from the house, with at least 1 inch of fall over every 10 feet, so the water drains away. Some joint sands ask for more, so check the bag or the maker’s data sheet. The finished gravel should end about 3 inches below where you want the top of the walk, which leaves room for the sand and the pavers.
That’s the base, and it’s the part I’d never rush.
Then the sand. Lay pipes on the gravel as guides and screed the sand by pulling a board along them. Set the pipes so the pavers will sit 3/8 inch above the finished level, because the last compaction pushes them down into place. Then pull the pipes and fill the grooves they leave with sand.
After the pavers and the edging are in, sweep them clean and run the plate compactor over the top. Make at least three passes, and switch direction each time. In my book, a rented plate compactor is the cheapest check first on any walkway job. It costs a lot less than lifting and relaying sunken pavers next year.
Edging That Actually Holds

Edge restraints are a critical part of how long a walk lasts. They keep the pavers from creeping out sideways. Plastic and metal restraints both work, and so do concrete edgers. Spike plastic or metal restraints into the compacted base. Never set any restraint on soil. That’s the one rule I’d never bend.
That’s why you dig wider than the walk. The restraint needs gravel under it to grab. Set it on dirt and it can lean, and the pavers follow it right out into the grass.
Once the restraint’s in, bring the soil and sod back up against it. You want the grass to meet the edge at the same height, so the mower can ride right over.
A Clean Mowing Edge: Flush With the Lawn, Wide Enough for the Wheels

If you ask me, a raised edge along a walk is a trimming chore forever. You can’t run the deck over it, so you leave a strip of grass and come back with the string trimmer every week. A flush edge fixes that.
One wheel rides on the hard surface and the blade cuts right to the line.
That flush band is called a mowing strip. It’s a narrow band of paving, under 450 mm wide, that a mower can pass right over, and it does away with trimming the edge after you mow. A clay brick strip about 100 mm wide, roughly 4 inches, works around a lawn. At home, 200 mm, about 8 inches, may be more than you need. On bigger commercial jobs, 300 mm, about 12 inches, gives a large mower ample room to get its blades over the grass edge. The rule that matters is the same at any width.
Flat, and flush with the lawn.
It’s a small job, I promise. On a sand bed, the dig only needs to be 60 to 70 mm deep, about 2 1/2 inches, with an extra 50 to 75 mm at the edges so you have room to work. The bricks go on a 25 to 50 mm bed of coarse grit sand, about 1 to 2 inches. Don’t use soft building sand, I mean it. It can go fluid when it’s waterlogged and let the strip sink. Tap each brick down with a rubber mallet to a string line or to the lawn itself.
If the strip will carry a heavy, tractor-mounted mower or something like it, set it in a mortar or concrete bed instead of sand, with as little mortar as you can manage on the grass side. Grass will still grow over it as long as there’s at least 25 mm, about an inch, of soil on top to root into. A strip like this helps along a fence line too, where a regular mower struggles to reach the edge.
Filling the Joints With Polymeric Sand

For the joints, my pick is polymeric sand. It seals them, which helps keep weeds and insects out, and it resists washing out on a slope. The trick is in the depth. With Gator’s polymeric sands, the sand should finish 1/8 inch below the top of the paver, or below the chamfer if your pavers have one. That way the pavers shield it from feet and tires. Redoing an old walk? Do me a favor and clean out at least 1 1/2 inches of the old joint sand first.
Weather matters too. Gator Maxx sand, for one, handles joints up to 2 inches wide, works when it’s above 32°F, and on a walk built on a gravel base like this one, it’s rain safe 1 hour after you wet it down. Pavers laid over an old concrete slab need 24 hours. Read the bag for the product you buy, because the times and widths aren’t the same across every brand and type.
Walkway Ideas That Make Mowing Easier

Now the fun part, if you ask me.
Here are a few looks worth trying. The paved ones go on the same base, and each one finishes flush at the lawn.
A straight walk with a brick border. Lay the field in whatever pattern you like and run a row of brick along each side as the mowing strip. The border reads as a frame, and it’s the part your wheels ride on.
A gentle curve. Curves look great, and I’d keep yours broad and sweeping, since those are easier to keep tidy than tight wiggles. Rectangular bricks leave open joints on a curve, which you can fill with mortar or close up by trimming the bricks into wedges.
A flagstone or stepping stone path. Stones set into the lawn are cheap and easy, and I’m a big fan of them. Set every one flush with the grass, using the same mowing-strip rule, so the deck passes right over and you never trim around them.
Gravel with a paver edge. If pavers across the whole walk are too much money, a gravel path with a flush paver edge on both sides gives you most of the mowing benefit. If you go that way, I’d read up on river rock landscaping before you pick the stone.
Whatever you pick, the order doesn’t change. Dig wide and deep, pack the gravel in thin lifts with at least 1 inch of fall every 10 feet, spike the edging into the base, sand the joints to 1/8 inch below the top, and finish every edge flush with the lawn. Do that, and I’ll bet the walk will still be flat when your mower’s worn out.